Harbin Science and Technology Industrial Park Project 星空传媒 Mixing Station successfully produced the first tank of asphalt mixture
On July 1, good news came from the Harbin Science and Technology Industrial Park, a project under construction by the municipal company. As the first heavy-duty truck loaded with asphalt mixture slowly drove out of the mixing station, it marked the successful commissioning of the concrete mixing station in Harbin Science and Technology Industrial Park, and sounded the clarion call for the company to enter the concrete market. The mixing plant covers an area of about 19,600 square meters and can produce high-quality asphalt concrete (200,000 tons/year), recycled asphalt concrete (100,000 tons/year), and cement concrete of various grades (60,000 m?/year). The production and supply capacity can meet the needs of construction projects such as improvement, maintenance and repair of the surrounding highways, municipal roads and old roads in Harbin City.
Since the construction of the Harbin Science and Technology Industrial Park project, the municipal company has taken the construction of the mixing station as the focus of its preliminary work. With the strong support of Bada Road and Bridge Company, the municipal company has made every effort to create all favorable conditions to promote the development of various tasks. The project department did not wait and did not rely on it, faced the difficulties, organized capable forces, arranged special personnel to be responsible for temporary construction, promoted the construction of the mixing station with high standards and strict requirements, and successively completed the site selection coordination of the project mixing station and the design of the mixing station Planning, approval of temporary electricity use procedures, and assembly of mixing buildings.
In order to ensure the smooth commissioning of the mixing station, the municipal company planned in advance, held special meetings, arranged special personnel to connect production materials, arranged special personnel to monitor the key positions and procedures, and conducted a comprehensive "physical examination" of all equipment to ensure the normal operation of machinery and equipment. In addition, the operators were trained to implement the plan disclosure and material mix ratio to ensure that the concrete quality was up to standard. After the on-site construction started, the staff of the mixing station guarded the "gates" to ensure that the production and debugging were in place at one time, and the trial-produced asphalt concrete mixture was of reliable quality and excellent performance. Specify requirements to lay a solid foundation for starting full-scale production.
The completion and commissioning of the mixing station in Harbin Science and Technology Industrial Park is an important node for municipal companies to optimize their industries and plan their layout. In the next step, the municipal company has the ability, confidence and determination to produce first-class concrete, strive to build a technological, intelligent and sustainable transportation technology industrial park, and provide strong support for the development of related industries of the group company.